Shindaiwa 400 Manuel de l'opérateur Page 29

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 38
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 28
10. Simultaneous Use of Welding and Generating
The circuit breakers (3-P and 1-P) react on the AC power supply circuit only. In the
simultaneous use of welding and generating, there sometimes happens overload to the
engine. Refer to the following table and limit the AC power use.
Limitation of AC Power Supply in the simultaneous use of welding and generating (60Hz)
Welding Output AC Power Output
Welding Rod
/ Amperage
Output
Select
3-Phase 380-415V Output
(P.F. 0.8)
1-Phase
Output
φ2.0mm/60A Dual 9.0kVA 10.5kVA
φ2.6mm/120A Dual 8.5kVA 9.0kVA
φ3.2mm/140A Dual 8.0kVA 8.5kVA
φ4.0mm/170A Dual 7.5kVA 7.5kVA
φ5.0mm/240A Single 2.5kVA 5.0kVA
φ6.0mm/300A Single 2.0kVA 2.5kVA
φ8.0mm/380A Single 0kVA 0kVA
 In order to secure stable AC output, the output selector switch should be positioned
to DUAL in operation as long as possible.
 The 1-Phase output is the total of 1-Phase from the receptacle and 1-Phase from
terminals.
<Caution>
z The simultaneous use of Eco welding and AC power is NOT available.
z Avoid the simultaneous use in the case high quality result in welding is
required.
11. Checking and Maintenance
Danger : Electric ShockInjuries
z Before performing any equipment check or maintenance, stop the engine, and
remove engine key. A person performing the maintenance should always keep
the key.
Caution: FireBurns
z Keep the equipment far away from fire.
z When checking engine, always stop the engine, and keep away from fire. Wait
until the engine cools down, before performing any checks.
<Caution>
z The authorized technicians should perform all checking and maintenance work,
except for the pre-startup checks.
z Request for the maintenance item with mark to the authorized distributor or
our engineering section.
z Always use our genuine parts of replacement.
To optimize the use of this generator/welder, we recommend the periodical equipment
checks and maintenance based on the following matrix.
Use the hour meter as a guide for the operating time.
- 28 -
Vue de la page 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 37 38

Commentaires sur ces manuels

Pas de commentaire