Shindaiwa BCK-11 Manuel de l'opérateur Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
5
Remove Power Head
1. Loosen drive shaft clamping bolt (A).
2. Pull outer tube (B) and drive shaft out of power head (C).
Remove Throttle Control Handle Assembly
1. Loosen handle clamp screw (D), and remove throttle control assembly
and cushioned hand grip (F) from outer drive shaft tube.
B
C
A
B
D
F
A
B
C, D
Install Power Head
1. Slide outer drive shaft assembly into power head clamp, and align
power head with gear case.
2. Secure drive shaft assembly with clamping bolt.
Install Harness Hanger
1. Slide harness hanger (A) on to outer drive shaft tube (B)
and loosely attach with 5 mm x 12 mm screw (C) and nut
(D). Do not tighten screw securely until nal adjustments
are completed.
Disconnect Throttle Cable-Ignition Wires
1. Loosen air cleaner cover knob and remove air cleaner cover.
2. Remove wire end of throttle linkage cable (A) from carburetor throttle
swivel hole.
3. Disconnect 2 ignition stop switch leads:
a. Disconnect wire with ring terminal from grounding screw (B) on
engine.
b. Pull quick-connect connectors (C) apart to disconnect remaining stop
switch wire.
Units with plain throttle cable end (P):
4. Remove throttle linkage cable from adjustment xture (D).
5. Unscrew throttle cable adjustment xture (D) and lock nut from carburetor
throttle cable bracket, and discard.
Units with throttle cable adjustment xture attached to cable end (T):
6. Unscrew throttle linkage cable with attached cable adjustment xture and
nut (T) from carburetor throttle cable bracket (E).
A
C
D
P
T
E
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 11 12

Commentaires sur ces manuels

Pas de commentaire